London, Brixton
Main Contractor: Democycle
Programme Length: 5 Weeks
Demolition of 1nr commercial unit with structural
connections to the 2nr neighbouring buildings,
asbestos removal, temporary works and design
Overview Of Works
-
Project Management.
-
Logistics Management.
-
HSE Management.
-
Enabling works.
-
210 Hitachi 360 Excavator.
-
Strip out of structures.
-
Demolition of 1nr redundant car garage.
-
Party wall temporary works.
.
-
Removal of non-notifiable asbestos.
-
Demolition of ground slab and foundations to a
depth of 2 metres. -
Removal of all associated waste.
-
Piling mat
-
Reduced dig
-
Crushing