London, Haringey

Client: Private

Main Contractor: Democycle

Programme Length: 12 Weeks

Removal of 4nr redundant diesel and heating tanks removed, 2nr residential houses and garage demolished.

Overview Of Works

  • Project Management.

  • Logistics Management.

  • HSE Management.

  • Enabling works.

  • 210 Hitachi 360 Excavator.

  • R400X Crusher.

  • Isolation and Draining of services.

  • Scaffolding for property protection.

  • Strip out of structures

  • Demolition of Sutton road garage &
    15nr garages.

  • Removal of 4nr redundant foam filled fuel tanks.

  • Demolition of a neighbouring residential
    4-bedroom property.

.

  • Removal of non-notifiable and notifiable
    asbestos.

  • Demolition of ground slab and foundations to a
    depth of 2 metres.

  • Reduced dig to an average depth of 1.3 Metres.

  • Supply and Install of an 875mm 900sqm piling
    mat to match the piling specification.

  • Crushing of all hardcore and concrete to type 1
    spec.

  • Saw cutting to retain party wall.

  • Supply and installation of temporary props to
    party wall.

  • Removal of all associated waste.