London, Haringey
Main Contractor: Democycle
Programme Length: 12 Weeks
Removal of 4nr redundant diesel and heating tanks removed, 2nr residential houses and garage demolished.
Overview Of Works
-
Project Management.
-
Logistics Management.
-
HSE Management.
-
Enabling works.
-
210 Hitachi 360 Excavator.
-
R400X Crusher.
-
Isolation and Draining of services.
-
Scaffolding for property protection.
-
Strip out of structures
-
Demolition of Sutton road garage &
15nr garages. -
Removal of 4nr redundant foam filled fuel tanks.
-
Demolition of a neighbouring residential
4-bedroom property.
.
-
Removal of non-notifiable and notifiable
asbestos. -
Demolition of ground slab and foundations to a
depth of 2 metres. -
Reduced dig to an average depth of 1.3 Metres.
-
Supply and Install of an 875mm 900sqm piling
mat to match the piling specification. -
Crushing of all hardcore and concrete to type 1
spec. -
Saw cutting to retain party wall.
-
Supply and installation of temporary props to
party wall. -
Removal of all associated waste.