London, Harrow

Client: Private

Programme Length: 6 Weeks

Project Type: Strip/Demolition/foundation removal

Job completion in Harrow, 8 residential houses and
foundations removed. hardcore crushed on site for
the next phase of works. Democycle Ltd acted as
Sub Contractor for this project.

Overview Of Works

  • Project Management.

  • Logistics Management.

  • HSE Management.

  • Enabling works.

  • 2 x 210 Hitachi 360 Excavator.

  • R400X Crusher.

  • Isolation and Draining of services.

  • Strip out of structures

  • Removal of non-notifiable and
    notifiable asbestos.

  • Demolition of ground slab and foundations to a
    depth of 2 metres.

.

  • Reduced dig to an average depth of
    1.3 Metres.

  • Supply and Install of an 875mm 900sqm
    piling mat to match the piling specification.

  • Crushing of all hardcore and concrete to type 1
    spec.

  • Removal of all associated waste

  • Day to day issues

  • Health & safety on site

  • Retaining live service and left in situ

  • Liaising with Management team daily

  • Waste Management