London, Harrow
Programme Length: 6 Weeks
Project Type: Strip/Demolition/foundation removal
Job completion in Harrow, 8 residential houses and
foundations removed. hardcore crushed on site for
the next phase of works. Democycle Ltd acted as
Sub Contractor for this project.
Overview Of Works
-
Project Management.
-
Logistics Management.
-
HSE Management.
-
Enabling works.
-
2 x 210 Hitachi 360 Excavator.
-
R400X Crusher.
-
Isolation and Draining of services.
-
Strip out of structures
-
Removal of non-notifiable and
notifiable asbestos. -
Demolition of ground slab and foundations to a
depth of 2 metres.
.
-
Reduced dig to an average depth of
1.3 Metres. -
Supply and Install of an 875mm 900sqm
piling mat to match the piling specification. -
Crushing of all hardcore and concrete to type 1
spec. -
Removal of all associated waste
-
Day to day issues
-
Health & safety on site
-
Retaining live service and left in situ
-
Liaising with Management team daily
-
Waste Management